3 data-loss incidents in 18 months
UPS & Enterprise Hardware
Zero downtime through 47 power events since deployment.
The challenge
Complex constraints.Real-world pressure.
Before architecture and implementation, we mapped every operational blocker and business risk. These were the core constraints shaping the entire solution design.
No power monitoring on the server room
Single-point UPS protecting critical servers
Generators with no automatic failover
What we built
A system built for the problem, not off the shelf.
We conducted a full power infrastructure audit: measuring server room load, identifying single points of failure, and testing the existing UPS runtime under actual load conditions. The audit confirmed the UPS batteries had degraded to 38% of rated capacity.
The replacement design specified a redundant online UPS configuration (N+1) with new battery banks sized for 30 minutes at full load, a static bypass switch, and an automatic transfer switch (ATS) for the generator with a sub-3-second failover time.
A dedicated power management system was installed, monitoring UPS health, battery state of charge, input and output voltages, and load percentage — with alerts to the operations team and to on-call engineering if any parameter crossed a threshold.
Capabilities delivered
Every feature with a reason.
N+1 redundant UPS configuration
Dual online UPS units in parallel with automatic failover. N+1 design ensures continuity if one unit requires maintenance.
Automatic transfer switch (ATS)
Sub-3-second automatic generator failover on mains failure. Tested monthly. Eliminates the 12-minute manual window.
Power management monitoring
Real-time UPS health, battery capacity, input/output quality, and load percentage. Alerting on threshold breach.
Power conditioning & surge suppression
Voltage regulation and surge suppression on all critical circuits. Protects against brownouts, spikes, and harmonics.
Battery management system
Automated battery health testing, temperature monitoring, and capacity estimation. Alerts on degradation before failure.
Full infrastructure documentation
Single-line diagrams, test reports, UPS configuration files, and maintenance schedules delivered at handover.
Measured outcomes
Numbers that changed how they operate.
Your project
Build your system with SezhiX.
Every project on this page started the same way — with a 30-minute conversation.
Next case study
Agri Drone Monitoring
Crop health mapped across 2,400 acres. Input costs down 28%.